Terms of Reference
Project: Berbak Green Prosperity Partnership
Duty station: Menteng, Jakarta
Donor: MCA-Indonesia
Firm (employer): Euroconsult Mott MacDonald
Introduction
The national Peatland Restoration Agency (Badan Restorasi Gambut or BRG) was formed early 2016 by the President in response to the massive forest and peat fires of 2015 which affected approximately 850,000 ha of peatland. Component 3 of the Berbak Green Prosperity Partnership (BGPP) aims at institutional strengthening of BRG.
Component 3 of the BGPP has a job opening for two short-term Senior Civil Engineers to provide short-term technical support with main tasks as below.
The Berbak GPP is funded by Millennium Change Account Indonesia (MCA-Indonesia).
Background of the assignment
BRG will develop peatland rewetting infrastructure, revegetation and revitalisation of local livelihoods in seven provinces. In order to expedite these activities two systems will be put in place through bidding system and working directly with communities.
Implementation of the works is separately tendered by MCA-Indonesia and will be implemented by third parties. On request of BRG, BGPP Component 3 will support BRG in the preparatory activities of the three biggest components (rewetting, revegetation and revitalisation) by the provision of two technical support staff with Civil Engineering qualifications as detailed below.
The selected candidates will be expected to start working with BGPP early June 2017, and the assignment is expected to be completed during three months. Details of the position are listed below:
Project: Berbak Green Prosperity Partnership
Duty station: Menteng, Jakarta
Donor: MCA-Indonesia
Firm (employer): Euroconsult Mott MacDonald
Introduction
The national Peatland Restoration Agency (Badan Restorasi Gambut or BRG) was formed early 2016 by the President in response to the massive forest and peat fires of 2015 which affected approximately 850,000 ha of peatland. Component 3 of the Berbak Green Prosperity Partnership (BGPP) aims at institutional strengthening of BRG.
Component 3 of the BGPP has a job opening for two short-term Senior Civil Engineers to provide short-term technical support with main tasks as below.
The Berbak GPP is funded by Millennium Change Account Indonesia (MCA-Indonesia).
Background of the assignment
BRG will develop peatland rewetting infrastructure, revegetation and revitalisation of local livelihoods in seven provinces. In order to expedite these activities two systems will be put in place through bidding system and working directly with communities.
Implementation of the works is separately tendered by MCA-Indonesia and will be implemented by third parties. On request of BRG, BGPP Component 3 will support BRG in the preparatory activities of the three biggest components (rewetting, revegetation and revitalisation) by the provision of two technical support staff with Civil Engineering qualifications as detailed below.
The selected candidates will be expected to start working with BGPP early June 2017, and the assignment is expected to be completed during three months. Details of the position are listed below:
- To develop Terms of Reference for rewetting infrastructure development in 6 provinces (Jambi, South Sumatera, Riau, West Kalimantan, South Kalimantan, Central Kalimantan)
- To develop engineering detailed design and specifications of canal blockings and deep wells
- To estimate the Bill of Quantities for both canal blockings and deep wells
- To develop owner’s estimate for canal blocking and development
- Minimum Bachelor’s, preferably Master’s Degree, in Civil Engineering
- Minimum 5 years working experience in construction supervision and design in wetlands
- Able to work under high pressure and in good collaboration with colleagues
- Good reporting and communication skills
- Versatile to work with Microsoft Office and Autocad, and other relevant software